Modular Classrooms

Published: Dec. 5, 2022, 7 p.m.

b'

The German International School Sydney consists of preassembled offsite CLT modules. The project aimed to build sustainable, prefabricated classrooms at a cost and time frame equivalent to traditional options whilst achieving the passive house design standard. In this episode we\'re speaking with Knut Menden, Principal at Betti & Knut Architects about:

  • Why 3D modular was the preferred construction method,
  • The overall costs compared to traditional demountable school designs,
  • The advantages and possibilities around repeatability,
  • And so much more!

If you want to learn more about designing or building with timber, I recommend you go to the WoodSolutions Website and download the Technical Design Guides:

https://www.woodsolutions.com.au/publications

I recommend watching the WoodSolutions weekly webinars. Previous recordings can be found on the WoodSolutions website:

https://woodsolutions.com.au/

'