Exposed timber post and beam structures leverage the benefits of biophilic design and wellbeing. From a design point of view there are a number of challenges that need to overcome. Nanyong Technological University Academic South Building is Asia\\u2019s last post, beam and CLT project. The 40,000 sq m project will cost $180 million and be completed in 2021. In part 1 of this 2 part series we\\u2019re speaking with Gary Caulfield, the project director and David Kingham, the project engineer about:

  • The 80/20 principle applied for the design and construction of timber structures
  • Utilising suppliers and contractors early in the project
  • Fire testing requirements and IP for approval of the exposed structure

Check out the WoodSolutions website, the world\'s biggest website on wood:

www.woodsolutions.com.au

The WS Technical Design Guide can be found here:

https://www.woodsolutions.com.au/articles/mid-rise-timber-buildings-design-guides

If you\\u2019ve got a mid-rise project that you want assistance with, you can get free advice from the WoodSolutions MAP Team. Just email me at jones@woodsolutions.com.au and we will get back to you.

'