Installing ESD Flooring in a 24/7 facility without disrupting operations

Published: June 16, 2019, 6:58 p.m.

Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it\u2019s important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces \u2013 without adhesive or chemicals and with neither downtime nor disruption.