On today\\u2019s show we\\u2019re talking about construction budgets and how to make sure you\\u2019re insulated from construction price increases during the early phases of a project.
\\nWhen you\\u2019re investing in new construction, you need to lock in expectations. You are setting expectations with your lender who is going to take a few months to underwrite the project and approve the loan. You\\u2019re dealing with investors and you\\u2019re setting expectations on the total equity investment and the rates of return.
\\nThen along comes a year like 2020, or 2021 and construction prices are volatile. How do you set realistic expectations with your lender on the total investment? How do you set expectations with your investors when the ground is shifting beneath your feet?
\\nThis raises the question about whether we\\u2019re in an inflationary environment or not. Are the price fluctuations an artifact of short term supply constraints? It\\u2019s been clear that lumber prices have swung wildly over the past 12 months. In March of 2020, lumber was priced at $264 per 1,000 board feet. By September, the price was $985 per 1,000 board feet and by November had fallen to about half that price. Today we\\u2019re back up around $1,000 per 1,000 board feet.
\\nAre these prices here to stay? Over the past 20 years, prices have fluctuated up and down. Energy prices are up compared with this time last year. Oil is now up to about $67 per barrel. That\\u2019s more than double the price at this time last year. We even had a short term supply glut when prices ran negative as some futures contracts expired with a shortage of midstream storage capacity.
\\nInflation as measured by the consumer price index is an average over a basket of goods.
\\nIf prices for materials go up, will rents go up correspondingly? Will salaries go up correspondingly or not? Which of the metrics be negatively impacted?
\\nModeling the future of a project that is a year away from construction becomes an exercise in Crystal ball gazing. How do you buffer your project for construction price increases? Do you assume that rents will go up or not?
\\nSo the question becomes, how do you plan your projects to be resilient in the face of inflation, and the beneficiary in the event of longer term inflation?
\\nWe\\u2019ve spent a lot of hours modelling these scenarios in our business as we put together various pro-forma estimates for our projects.
\\nThere are two questions that you need to answer.
\\nIt\\u2019s the second scenario, running out of cash that is the most dangerous to a project. You have to make sure you don\\u2019t run out of cash. That means using your leverage responsibly. It means increasing your loan reserves to protect the project. It means bringing 5% more equity to the table. If you bring 5% more equity to the table, you could theoretically borrow 5% more money if you needed to. That doesn\\u2019t mean you have to increase the cost of the project by 5% in your pro-forma. You still have your original plan based on a prudent forecast of construction costs. But if you had to ask the bank for additional funds, you have the necessary equity already raised as part of your capital raise to handle the larger loan request.
\\nIn an inflationary environment, the road can be bumpy. It will likely work out in the end and leverage will multiply your returns. But you need to design in a buffer to protect yourself from the downside risk.
'