Sizing Main Bonding Jumpers, Systems Bonding Jumpers, and Supply-Side Bonding Jumpers

Published: Aug. 24, 2019, 5:16 p.m.

Listen as Paul Abernathy talks about sizing Main Bonding Jumpers (MBJ), System Bonding Jumpers (SBJ), and Supply-Side Bonding Jumpers (SSBJ) on grounded electrical systems and separately derived systems.

Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.