2020 NEC Changes - Section 210.8(A) through (F) Explained

Published: Aug. 31, 2019, 5:58 p.m.

Listen as Paul Abernathy, member of NFPA Code Panel(s) #5 and #17, talk about the significant changes to section 210.8 for Ground-Fault Circuit-Interrupters within the 2020 National Electrical Code.

Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.