Tiptoeing Into The Extraordinary

Published: Sept. 1, 2023, 10 a.m.

\nMatthew 14:27 And when Peter was come down out of the ship, he walked on the water, to go to Jesus. But when he saw the wind boisterous, he was afraid; and beginning to sink, he cried, saying, Lord, save me.\n\n