Psalm 23
\n1\xa0The\xa0Lord\xa0is my shepherd; I shall not want.
\n2\xa0He maketh me to lie down in green pastures: he leadeth me beside the still waters.
\n3\xa0He restoreth my soul: he leadeth me in the paths of righteousness for his name's sake.
\n4\xa0Yea, though I walk through the valley of the shadow of death, I will fear no evil: for thou art with me; thy rod and thy staff they comfort me.
\n\n\n