75. Spring Updates for May 4, 2023

Published: May 4, 2023, 9 a.m.

Talking notes for this episode include:

-Flow rate adjust reminders and here is a link to the flow rate adjustment worksheet https://s3.amazonaws.com/pp3-products/file-1643726560/Flow%20Rate%20Adjustment%20and%20Orifice%20Worksheet.pdf

-A couple things to watch for with command and actual flow around the vApply Rate controller in the manual health check.

-A reminder some GPS systems will output location from the bar instead of the globe

-A few thoughts around the best practices when it come to diagnosing a row fail. Also below are the values that represent 1/1000 of an acre based on row spacing:

38in- 13'9"

36in- 14'6"

30in- 17'5"

22in- 23'9"

20in- 26'2"

19in- 27'6"

15in- 34'10"

-Hans passes along his recommendations on where to start when facing a intermittent, planter-wide issue or an intermittent issue on a row

-What to check when seeding/seedtubes are still white in the diagnose screen after all seeding hardware is set up properly.