108: Spring Updates for May 30, 2024

Published: May 30, 2024, 9:30 a.m.

Show notes for this Symphony focused episode include:

First Day Testing

- Starting up the system with OEM swath harness; using the quick start feature to validate proper setup and swath

-Helpful notes on flowmeter tags from Deere and Raven

-Nozzle sizing resources. Included here is a link to the Wilger Tip Wizard mentioned in the episode

In Field Tips

-Tips on setting the row fail action

-How to clean a nozzle that is stuck or partially stuck

-What to do when spraying multiple passes in the same field

-How to set the system up for y-drop application

-Using "Sprayer Purge Control" for cleaning out or draining a boom