Rethink Energy 183: Grid battery industry doubles in 2024, US uranium sanctions

Published: May 10, 2024, 7:44 a.m.

In this episode the Rethink Energy team discusses:

\n
    \n
  • China and the US are both set to double both their rate of battery installations and their cumulative battery capacity on the grid in 2024 - making batteries the third main type of renewable energy project development alongside wind and solar.
  • \n
  • The US sanctions on Russian uranium fuel - and how Kazakhstan's mined uranium can still find its way to the US market despite Russia having a plurality of enrichment and hexafluoride conversion production capacity.
  • \n
\n


\n

\n\n